4-Legged Jacket & Topside Installation Procedure (Fixed Offshore Platform/Structure)

topside installation by nippon oil kuroshio 1

Heavy Lift Operation.
Lifting of Module to set-up onto MSF (Module Support Frame)

This is a generic Table of Content for Fixed Offshore Structure Installation Procedure. As a field engineer, developing of this kind of procedure is part of my daily job in the office. I hope this section will help you to get the picture how the fixed offshore platform/structure were installed. I’ll try to write in a very simple way just to ensure any layman will get the brief view on how platform installed offshore. I’m not going to write the actual procedure! Just in form of narative.

(All procedures are belong to the COMPANY & if you require a sample, please go through the proper channel)

GENERAL
Introduction
Installation Reference Documentations
Procedures and Documents
Structural Drawing Index for Offshore Installation

PRE-LOADOUT, LOADOUT AND TRANSPORTATION

Introduction
Pre-Loadout
Platform Pre-Rigging
Loadout and Transportation
General

JACKET INSTALLATION

Introduction and Key Information

Jacket Installation
General Procedure
Pre-Installation Check List
Jacket Lift
Jacket Upend

Installation Tolerance

Anchor Pattern for PLATFORM Jacket Installation
Offset Measurement for Jacket Positioning and Setting
PLATFORM Survey Prism’s Socket Aids
PLATFORM Foot Print and Debris Survey
Barge Set Up for PLATFORM Jacket Lift
PLATFORM Jacket Side Lift Rigging Make-up
PLATFORM Jacket Side Lift Pre-rigging and Tiedown Arrangement
Lift Chart for PLATFORM Jacket Side Lift
PLATFORM Jacket Side Lift and Upend Rigging Arrangement
PLATFORM Jacket Upend Rigging Make-up
PLATFORM Jacket Upend Pre-rigging and Tiedown Arrangement
PLATFORM Jacket Lift, Rotation & Upending Sequence

MAIN PILE INSTALLATION

Introduction And Key Information

Pile Driving Hammers

Pile Installation
Barge Set-Up
Pile Installation Sequence
Pile Monitoring
Jacket Leveling Methods

Pile Driving Refusal Criteria

Contingency
Introduction
Jetting/Air Lift Procedures

Shim Plates Welding Criteria

PLATFORM Pile Make-Up
PLATFORM Main Pile Lift Rigging Details Typical
Barge Set-Up for PLATFORM Pile Installation
PLATFORM Main Pile Pick-up Calculation
Lift Chart for PLATFORM Pile Lift-Off
Lift Chart for PLATFORM Main Pile Setting
PLATFORM (60” Æ) Main Pile Driving Schematic
Arrangement to Jack Jacket Up and Jacket Down
Jack Frame/Jack Pad Details

CONDUCTOR INSTALLATION

Introduction And Key Information

Conductor Driving Hammers

Conductor Installation
Barge Set-Up
Conductor Installation Procedure

Conductor Driving Refusal Criteria

Contingency

PLATFORM 26” Ø Conductor Make-Up
PLATFORM Conductor Lift Rigging Details
Barge Set-Up for PLATFORM Conductor Installation
Lift Chart for PLATFORM Conductor Setting
PLATFORM 26” Æ O.D. Conductor Driving Schematic
Conductor Installation and Driving Sequence
External Clamp for 26ӯ Conductor

PLATFORM TOPSIDE INSTALLATION

Introduction and Key Information

Pre-Lift Check List

Topside Lift and Setting

Post Set-Down Activities

PLATFORM Topside Installation Anchor Pattern
Barge set-up for PLATFORM Topside Installation.
PLATFORM Topside Rigging Arrangement
PLATFORM Topside Lift Pre-rigging and Tiedown Arrangement
Lift Chart for PLATFORM Topside Lift-off and Installation.

PLATFORM APPUTENANCES

Introduction

Platform Appurtenances Installation and Removal Task Sheets

Pile and Conductor Drivability Curves
Extract from PLATFORM Jacket On-bottom Stability Analysis
Extract from PLATFORM Conductor Hang-off Study
Minimum Conductor Bear Clamp Bolts to release ILT
Minimum Weld Requirement for Main Pile P3/P2 to release ILT
Refusal Criteria MENCK Offshore Hammers
Derrick Barge Seastate Limitation for Lifting


Posted by : Sulaiman Sabur
Biography : Author (also the WebMaster) hold a degree in Mechanical Engineering from University of Malaya. He has extensive experience in offshore construction and currently employed by one of the Major Offshore Construction Company in Malaysia.

How to post your own article << Click Here !


5 Responses to '4-Legged Jacket & Topside Installation Procedure (Fixed Offshore Platform/Structure)'

Subscribe to comments with RSS or TrackBack to '4-Legged Jacket & Topside Installation Procedure (Fixed Offshore Platform/Structure)'.

  1. Orang Laut said,

    on 31st, August

    Very interesting website, with lots of pics. All the procedures (heavy lift, pipelay, beach pull, riser installation, etc) are interesting as well. But only the headings are shown. Where are the actual contents?

  2. on 1st, September

    The actual content is being edited to ensure it is not violate the copywrite of my current employer. Yes, i’ll upload the procedure once i have the time. Thank you for your response and interest.

  3. Abani Pattnaik said,

    on 4th, December

    Dear Sir,
    Please give me some insight into Onbottom stability analysis, specifically about the wave forces and moment that tends to topple the jacket..

  4. Yati Zaki said,

    on 8th, July

    Hi all engineers…I am currently looking for Structural Engineer (Offshore exposure) as well as Technical Specialist – Pressure vessels for my Client (Oil & Gas MNC status). I am looking at at least 7 years of Oil & Gas experience and salary is open for negotiation…

Websites Linked to this Article

  1. » Subsea Pipeline Installation (S-Lay) & Beach Pull (Shore Approach) · Offshore Oil & Gas Future Development

Leave a Reply

Latest Comments


subscribe to offshore oil and gas news

SUBSCRIBE to Latest Posts by Email


Your email is safe from spam. All emails will be handled by FeedBurner a Google Company.
Subscribe Safely NOW