Offshore Oil & Gas Future Development







Documents & Drawings : Jacket & Topside Installation Procedure ( Fixed Offshore Structure )

Implementation of Project On Paper

Picture taken during IPOP (Implementation of Project On Paper). IPOP is an important part during procedure development. IPOP where all related people brainstorming the approved procedures and ensure all necessary precaution have been made, prepared and implement to ensure safe execution of works! Yea thats the word for IPOP….

This section is part of the fixed offshore structure installation procedure. To view & navigate the table of content, please click here.


Jacket & Topside Installation Procedure ( Fixed Offshore Structure )

Installation Reference Documentations

Procedures and Documents

Apart from this Platform Installation Procedure, other documents related to this procedure are as follows:

  • Platform Loadout Coordination Manual for Jacket
  • Platform Loadout Coordination Manual for Topside
  • Rigging Calculations
  • Jacket Upending Study
  • Jacket On-bottom Stability Analysis
  • Jacket Transportation Analysis
  • Topside Transportation Analysis
  • Pile & Conductor Drivability Study
  • Conductor Hang-off Study
  • Platform Pre-Installation Survey Report

Structural Drawing Index for Offshore Installation

This section should content the list of AFC (Approved for Construction) drawings provided by Client. This part is important for offshore references.

[ Back to Procedure Table Of Content ]


Posted by : Sulaiman Sabur
Biography : Author (also the WebMaster) hold a degree in Mechanical Engineering from University of Malaya. He has extensive experience in offshore construction and currently employed by one of the Major Offshore Construction Company in Malaysia.

How to post your own article << Click Here !


3 Responses to 'Documents & Drawings : Jacket & Topside Installation Procedure ( Fixed Offshore Structure )'

Subscribe to comments with RSS or TrackBack to 'Documents & Drawings : Jacket & Topside Installation Procedure ( Fixed Offshore Structure )'.

  1. fe.azwan said,

    on 16th, January

    Jacket Launch Analysis may included for a heavy jacket that can be lifted directly using Derrick Barge crane

  2. fe.azwan said,

    on 16th, January

    Jacket Launch Analysis is needed for a heavy jacket that can not be lifted directly using Derrick Barge

Websites Linked to this Article

  1. » 4-Legged Jacket & Topside Installation Procedure (Fixed Offshore Platform/Structure) · Offshore Oil & Gas Future Development

Leave a Reply

Latest Comments


subscribe to offshore oil and gas news

SUBSCRIBE to Latest Posts by Email


Your email is safe from spam. All emails will be handled by FeedBurner a Google Company.
Subscribe Safely NOW