Documents & Drawings : Jacket & Topside Installation Procedure ( Fixed Offshore Structure )

Picture taken during IPOP (Implementation of Project On Paper). IPOP is an important part during procedure development. IPOP where all related people brainstorming the approved procedures and ensure all necessary precaution have been made, prepared and implement to ensure safe execution of works! Yea thats the word for IPOP….
This section is part of the fixed offshore structure installation procedure. To view & navigate the table of content, please click here.
Jacket & Topside Installation Procedure ( Fixed Offshore Structure )
Installation Reference Documentations
Procedures and Documents
Apart from this Platform Installation Procedure, other documents related to this procedure are as follows:
- Platform Loadout Coordination Manual for Jacket
- Platform Loadout Coordination Manual for Topside
- Rigging Calculations
- Jacket Upending Study
- Jacket On-bottom Stability Analysis
- Jacket Transportation Analysis
- Topside Transportation Analysis
- Pile & Conductor Drivability Study
- Conductor Hang-off Study
- Platform Pre-Installation Survey Report
Structural Drawing Index for Offshore Installation
This section should content the list of AFC (Approved for Construction) drawings provided by Client. This part is important for offshore references.
| Posted by : Sulaiman Sabur | |
| Biography : Author (also the WebMaster) hold a degree in Mechanical Engineering from University of Malaya. He has extensive experience in offshore construction and currently employed by one of the Major Offshore Construction Company in Malaysia. |
How to post your own article << Click Here !
3 Responses to 'Documents & Drawings : Jacket & Topside Installation Procedure ( Fixed Offshore Structure )'
Websites Linked to this Article
Leave a Reply
![]() SUBSCRIBE to Latest Posts by EmailYour email is safe from spam. All emails will be handled by FeedBurner a Google Company. Subscribe Safely NOW |

on 16th, January
Jacket Launch Analysis may included for a heavy jacket that can be lifted directly using Derrick Barge crane
on 16th, January
Jacket Launch Analysis is needed for a heavy jacket that can not be lifted directly using Derrick Barge