Offshore Jacket Piling (Hydraulic Vs. Steam)

What a nostalgic picture… Especially the one on the left.  Its a steam hammer!!! Haven’t come encounter one since year 2000.    The last time i use this hammer, Vulcan Hammer was during onboard DB 30 installing ANGP-A 8 legged jacket for Petronas Carigali Malaysia.  Nowdays most of the time; or i would say every piling works i encounter would be utilizing Hydraulic Hammer, specifically Menck Hydraulic Hammer.  No more steam hammer.  Even DB 30 (If i’m not mistaken) have removed the steam vessel for the steam hammer (Which last time was installed permanently onboard the barge). 

My current employer, worth to mention SapuraCrest Petroleum Berhad now owned a small ‘fleet’ of hammers, which is MHU 270, MHU 500 & MHU 800s.  There is a lot of technical reason why they come out with this ‘trio’.  Putting a side a cost factor, the reasons why would be;

  • MHU 270 = Most of the time can drive all conductors.
  • MHU 500 = Most of the time can drive piles (Especially in SEA soil condition) and depend on the stick-up calculation, it would also act as a standby Hammer for conductor installation.
  • MHU 800s = Cannot say more… but, have encounter one case where Piling have to bee done by the MHU 1600 (owned by McD) – Somewhere in Malaysia-Thai Joint Venture Area.

Brief on the above Menck Hydraulic Hammer specifications :

MHU 270T Specification:

  • Energy Range (Min/Max) = 30-305 kJ
  • Blowrate  = 40 Bl/Min
  • Weight = 30.8 Mt
  • Length = 9.6 m

MHU 500T Specification:

  • Energy Range (Min/Max) = 50-550 kJ
  • Blowrate  = 38 Bl/Min
  • Weight = 54.2 Mt
  • Length = 11.8 m

MHU 800S Specification:

  • Energy Range (Min/Max) = 80-800 kJ
  • Blowrate  = 38 Bl/Min
  • Weight = 79.6 Mt
  • Length = 12.5 m

Btw, Back to the original story which suppose to be Steam vs Hydraulic hammer… I believe some of the readers aware about the difference and pro-con about the two system.  You might want to share with us by commenting this post.  I leave you with a video of steam hammer in action… NOSTALGIC !

YouTube Preview Image

Posted by : Sulaiman Sabur
Biography : Author (also the WebMaster) hold a degree in Mechanical Engineering from University of Malaya. He has extensive experience in offshore construction and currently employed by one of the Major Offshore Construction Company in Malaysia.

How to post your own article << Click Here !


4 Responses to 'Offshore Jacket Piling (Hydraulic Vs. Steam)'

Subscribe to comments with RSS or TrackBack to 'Offshore Jacket Piling (Hydraulic Vs. Steam)'.

  1. zaid said,

    on 24th, October

    salam.. nice blog and article
    thanks and smile

  2. on 27th, October

    thank you for the visit. will write & share more about my experience.

  3. hans said,

    on 30th, October

    Dear Bro ..

    Long time ..bah .. no update.. how’s TLO?

  4. fnd said,

    on 2nd, November

    Nice,classic steam hammers….For certain areas, in case of pile refusal will need air lifting, or even drilling (with rig or drilling-off-the-boom)…

Websites Linked to this Article

Leave a Reply

Latest Comments


subscribe to offshore oil and gas news

SUBSCRIBE to Latest Posts by Email


Your email is safe from spam. All emails will be handled by FeedBurner a Google Company.
Subscribe Safely NOW