Petronas Carigali MASA Development Project
- Transportation analysis and tiedown design for Sotong Jacket Platform STJT-A.
- Transportation analysis and tiedown design for Malong Jacket Platform MLJT-A.
- Transportation analysis and tiedown design, two block upending for Anding Jacket Platform ADJT-A.
- Transportation analysis and tiedown design for the 16â€, 14â€, 12â€, 6†and 4†linepipes.
Petronas Carigali MASA Pipeline Development Project
- Pipelay analysis for the STJT-A/FPSO 16†diameter pipeline.
- Pipelay analysis for the SCP/FPSO 12†diameter pipeline.
- Pipelay analysis for the MLJT-A/FPSO 14†diameter pipeline.
- Pipelay analysis for the MLJT-A/FPSO 6†diameter pipeline.
- Pipelay analysis for the MLJT-A/FPSO 4†diameter pipeline.
- Pipelay analysis includes the anchor start-up, abandonment recovery, and weld repair calculations.
EPMI Bekok-C Riser Change out
- Riser analysis for the Bekok-C Risers.
EPMI Baram BAJT-D/BADP-A Field
- Pipelay analysis for the 6†diameter BAJT-D/BADP-A pipeline.
- Riser installation analysis at BAJT-D and BADP-A Platforms.
SSB/SSPC D35JT-C Development Project
- Transportation analysis and tiedown design for D35JT-C Jacket and Top Template.
SSB/SSPC F23K-A Development Project
- Transportation analysis and tiedown design for F23K-A Jacket.
- Floatation and Upending Analysis for F23K-A Jacket.
- Transportation analysis and tiedown design for F23K-A Module and MSF.
- Transportation analysis and tiedown design for F23K-A Bridge.
Petronas Carigali Resak Development Project
- Transportation analysis and tiedown design for D35JT-C Jacket and Top Template.
- Launching analysis for the Resak Central Processing Platform Jacket.
- Floatation and upending analysis for the Resak Central Processing Platform Jacket.
- Transportation analysis and tiedown design for Resak Drilling Platform RDP-A.
- Floatation and upending analysis for the Resak Drilling Platform RDP-A. Jacket Transportation analysis and tiedown design for Malong Jacket Platform MLJT-A.
- Transportation analysis and tiedown design, two block upending for Resak Flare Platform RFP Jacket.
- Transportation analysis and tiedown design for MSF North and South.
- Transportation analysis and tiedown design for Module 4,5,6, and 7.
Petronas Carigali Resak Pipeline Development Project
- Pipelay analysis for the RDP-A to OGT 28†pipeline. Pipelay analysis include the anchor start-up, abandonment and recovery, and weld repair calculations.
- Mid-point tie-in analysis for the RDP-A to OGT at KP10.
- Riser analysis at RDP-A Platform.
- Transportation analysis and tiedown design for the 28†diameter linepipes.
Petronas Carigali Semarang SMP-A/SMP-C Field
- Pipelay analysis for the 8†diameter SMP-A/SMP-C pipeline.
- Riser installation analysis at SMP-A and SMP-C Platforms.
SSB/SSPC F6K-A Development Project
- Transportation analysis and tiedown design for F6K-A Jacket.
- Floatation and Upending Analysis for F6K-A Jacket.
- Transportation analysis and tiedown design for F6K-A Module and MSF.
- Transportation analysis and tiedown design for F6K-A Bridge.
Petronas Carigali Angsi Development Project
- Transportation analysis and tiedown design for ANDR-A Jacket.
- Launching analysis for the ANDR-A Jacket.
- Floatation and upending analysis for the ANDR-A Jacket.
- Transportation analysis and tiedown design for ANDR-A Riser and Wellhead Topsides.
- Transportation analysis and tiedown design for ANDR-A Flare Boom.
- Transportation analysis and tiedown design for MSF North and South.
Petronas Carigali Angsi Pipeline Development Project
- Pipelay analysis for the OSC to ANDR-A 32†pipeline. Pipelay analysis include the anchor start-up, abandonment and recovery and weld repair calculations.
- Pipelay analysis for the ANDR-A to GUD-D 32†pipeline.
- Pipelay analysis for the ANDR-A to IB-A 16†pipeline.
- Pipelay analysis for the ANDR-A to ANDR-B 16†pipeline.
- Pipelay analysis for the ANDR-A to ANDR-B 6†pipeline.
- Pipelay analysis for the ANDR-A to ANDR-B 12†pipeline.
- Mid-point tie-in analysis for the RDP-A to OGT at KP10.
- Riser analysis at ANDR-A and GUD-D Platform.
- Transportation analysis and tiedown design for the 32â€, 16â€, 12â€, and 6â€diameter linepipes.
| Posted by : Sulaiman Sabur | |
| Biography : Author (also the WebMaster) hold a degree in Mechanical Engineering from University of Malaya. He has extensive experience in offshore construction and currently employed by one of the Major Offshore Construction Company in Malaysia. |
How to post your own article << Click Here !
9 Responses to 'Sample of Analysis done by Offshore Construction Engineers (Engineering Department)'
Websites Linked to this Article
Leave a Reply
![]() SUBSCRIBE to Latest Posts by EmailYour email is safe from spam. All emails will be handled by FeedBurner a Google Company. Subscribe Safely NOW |

on 24th, December
Ini cuma sebahagian daripada kerja engineers. ada banyak lagi sample analysis yang perlu mereka jalankan.
on 24th, December
Yea, some of them are..
Padeye analysis
Bearclamp holding capacity
Weld Repair calculations
Stinger ballast & Deballast
Davit lift capacity
and the list goes on…
on 24th, December
Bestla hangpa kerja opis. Tak payah nak berjauhan dengan anak bini berbulan bulan. Walau apa pun, kita saling memerlukan. Kalau engineer tak ada buat analysis, maka tak ada lah kami kerja di laut ini. HIDUP PETRONAS!
Sebelum itu, saya ingin mengucapkan TAHNIAH kepada Petronas kerana memberikan rakyat Malaysia peluang bekerja di dalam industri Oil & Gas ini. MALAYSIANIZATION program yang diperkenalkan oleh PETRONAS seharusnya diikuti oleh semua syarikat besar dan kerajaan sepatutnya meng’imposed’ program sebegini untuk contract yang besar besar.
Sekali Lagi, TAHNIAH untuk PETRONAS !
on 3rd, April
Hi,
Look your analysis/calc will be much complicated than ordinary structures I worked on. Huh! the strucures are alient to me! Just wondering, if I’m a building structural engineer (consultant), how can I switch to offshore?
on 12th, December
Hi,
Good work man! This is the 1stime I come here.
COme back later
on 12th, December
You are welcome here. Dont forget to link this website to your BLOG/Website or Profile in Friendster/MySpace/FaceBook etc.
By spreading the news giving me more resources to keep on writing & sharing what ever things i know about Oil & Gas.
on 12th, December
where is d office.??
on 24th, December
Saya nak bertanya, jika ada kekosongan untuk jawatan gas engineer. Saya ada pengalaman design LPG and NG distribution untuk building.
on 27th, December
sy nak tanya..
saya ader diploma jer dlm mechanical engineering…
ader tak peluang untuk saya kerja kat compeni mcm nie…
kalu ade, mcm mana sy nak apply???
thanks..