Subsea Pipeline Installation : Spool Installation

riser installation for subsea pipeline offshore

Here is the summary of OIC responsibility on the scope of Spool Installation during typical shallow water pipelay operations:

Setting-up the installation spread for pipeline/PLEM tie-in operations.

Fabricate and hydrotest the tie-in spool. Coating and wrapping tie-in spools including joints and bends as required.

Lowering, aligning, installing and positioning spools on the seabed.

Locating Pipeline ends, cutting off and connecting the expansion spools to the Pipelines and connection with PLEM(s).

Installing all flanged tie-in connnections with appropriate hydraulic bolt tensioning equipment.

Carrying out ROV surveys as directed by client before, during and after spools and pipelines tie-in operations.

offshoreman working in offshore contract construction


Posted by : Sulaiman Sabur
Biography : Author (also the WebMaster) hold a degree in Mechanical Engineering from University of Malaya. He has extensive experience in offshore construction and currently employed by one of the Major Offshore Construction Company in Malaysia.

How to post your own article << Click Here !


Leave a Reply

Latest Comments


subscribe to offshore oil and gas news

SUBSCRIBE to Latest Posts by Email


Your email is safe from spam. All emails will be handled by FeedBurner a Google Company.
Subscribe Safely NOW