About Offshoreman.net
The BLOG in no way affiliated with any branch of the oil and gas industry. I’m just an offshoreman who loves my career & passionate to share my experience & knowledge to the whole world. Hope you enjoy my blog.
Below is the list of my EXPERIENCE in Oil & Gas Industry.
(Btw, Im currently employed by one of the Leading Malaysian Offshore Construction in Turkmenistan, Sigur Ros Sdn. Bhd. More details visit their website http://www.sgrsb.com)
Core Skills & Experiences summarized as follow:
(Contact person to verify the mentioned skills will be provided upon request)
- Hands on Experience in Various Offshore Installation Projects
(Starting Fresh as an Offshore Field Engineer. Onboard so many vessels & DLBs with an uncountable SEA SICK crew boat ride & countable helicopter ride. Working as Offshore Construction Contractor we don’t have privilege for a helicopter service except for some special occasion. & Don’t forget the experience working in harsh environment PLUS with pain in the **** supervisors [They are all my good friends now] ) - Completed Numbers of cycle in Offshore Installation Project Starting from Tendering, Execution to Project Closed out.
(This is the stage where managing contract, People & resources is the main part of the WORK. & Tendering, yup! the part where when you make mistake & miss a single detail will hunt you for the rest of the CONTRACT period … ) - Project Specialized skills based on direct involvement & hands on experience summarized as follows:
a. Technical tendering preparation, Clarification & Qualification
b. Project Planning & Scheduling for Tendering, Actual Execution & As-Builting
c. Identify Project material & service requirement,
d. Technical Query Based on Contractual requirement and AFC Drawings.
e. Engineering calculation for heavy lift and any onsite engineering support.
f. Procedures development, Pipelay, Heavy lift, Riser installation, spool, PLEM, beach pull etc.
g. Onboard installation barges/vessel for the actual work execution.
h. Project as builting document & close out report.
i. Technical support on project change order, costing & HSE.
j. Training of new engineers (Operation Department One-Stop-Center Knowledge Base)
- TENDERING for TOTAL E&P INDONESIE SOUTH MAHAKAM PROJECT – PHASE 1 & PHASE 2
- TENDERING FOR PTSC FOR TRANSPORTATION & INSTALLATION FOR TGT (TE GIAC TRANG) FIELD
- TENDERING FOR PCVL (VIETNAM) FOR PROVISION OF TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR TOPAZ DEVELOPMENT PROJECT.
- ASSIST JV COMPANY TO TENDER FOR ONGC MHN 06 WELL HEAD PLATFORM
- TENDERING FOR PAN MALAYSIAN PSC FOR INTEGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES FOR ALL PACKAGES (A,B,C & D)
- RETENDER FOR CPOC T&I OF MDD PLATFORM & EPCIC FOR MDD PIPELINE.
- TENDERING FOR PETRONAS SEMARANG PIPELINE REPLACEMENT
- ASSIST JV COMPANY TO TENDER FOR IRANIAN OFFSHORE OIL COMPANY RESHADAT SUBSEA PIPELINE AND CABLES INSTALLATION.
- TENDERING FOR PETRONAS CARIGALI SDN. BHD. FOR PROVISION TO SUPPLY MANPOWER, EQUIPMENT AND MATERIALS FOR FABRICATION AND INSTALLATION OF V-290 CORRODED BRIDLE AT TCOT FOR PETRONAS CARIGALI SDN. BHD. PENINSULAR MALAYSIA OPERATIONS (PMO)
- RFQ FOR DOLPHIN OFFSHORE ENTERPRISE (INDIA) LIMITED FOR NORTH TAPTI GAS FIELD DEVELOPMENT PROJECT.
- RFQ & PRE-QUALIFICATION FOR KPOC PIPELINE INSTALLATION.
- TENDERING FOR BPWEST JAVA PIPELINE REPLACEMENT PROGRAMME.
- PRE-Q FOR PROVISION OF OFFSHORE HOOK-UP AND COMMISSIONING OF EAST BELUMUT AND CHERMINGAT FACILITIES FOR YEAR 2009
- BUDGETARY PROPOSAL FOR MARINE SPREAD FOR LEIGHTON CONTRACTS (INDIA) PVT. LTD FOR ONGC’S PRP-II PROJECT, WEST COAST OF INDIA.
- RFQ FOR LARSEN & TOUBRO LIMITED : PCML YETAGUN PHASE 4 DEVELOPMENT PROJECT
- TENDERING FOR PETRONAS : TRANSPORTATION, INSTALLATION AND COMMISSIONING SUPPORT OF SUBSEA SYSTEM FOR KUMANG CLUSTER DEVELOPMENT
- TENDERING FOR JV COMPANY : MHN-PIPELINE AND MODIFICATION PROJECT OF ONGC, MUMBAI
- TENDERING FOR JV Company : RS12 RS14 WELLHEAD PLATFORM PROJECT
Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications. - TENDERING FOR PETRONAS TURKMENISTAN : INSTALLATION AND PRE-COMMISSIONING OF OFFSHORE PIPELINE SYSTEM PACKAGE
- TENDERING FOR CPOC : MDD FIELD DEVELOPMENT (new proposal and new contract)
- TENDERING FOR PETRONAS : TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR 10″ X 0.67KM BOP-A TO BODP-C PIPELINE PROJECT MATERIALS (BOKOR PIPELINE)
- TENDERING FOR CPOC : MDD 18″ PIPELINE INSTALLATION
- TENDERING FOR SSB : RFQ-010 INSTALLATION OF F23R-A AND CILIPADI PLATFORM AND PIPELINE BETWEEN THE TWO PLATFORMS
- TENDERING FOR PETRONAS : TRANSPORTATION AND INSTALLATION OF EQUIPMENT ONTO B11P-A PLATFORM – PROPOSAL
- TENDERING FOR JV Company : MHN PROCESS PLATFORM AND LIVING QUARTERS PROJECT
- TENDERING FOR JV COMPANY: ICP-R PROCESS PLATFORM PROJECT
- TENDERING FOR JV COMPANY : B-193 FIELD DEVELOPMENT PROJECT (B-193,B-172,B-178,B-179,B-28 A & B-23 A)
- TENDERING FOR PETRONAS : TRANSPORTATION AND INSTALLATION OFEQUIPMENT ONTO B11DR-A PLATFORM – PROPOSAL
- TENDERING for PETRONAS : DULANG AND BEKOK PIPELINE REPLACEMENT.
- Liaise with CLIENT & subcontractor interface to initiate & kicking off the project. Properly Handed over to PMT upon completion of project/company revised organization charts.
- TENDERING for TECHNIP/ PREMIER OIL : PROVISION OF PLATFORM(S) AND PIPELINES FOR THE BLOCK 12 DEVELOPMENT
- TENDERING for SSB : TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES
- TENDERING for TALISMAN : CHARTER PIPELAY/ DERRICK BARGE FOR INSTALLATION OF STALK-ON RISERS FOR BLOCK PM-3 CAA NORTHERN FIELDS DEVELOPMENT PROJECT.
- Assist project manager to kick off the project upon completion of PMT.
- TENDERING for NEWFIELD : INSTALLATION OF EAST BELUMUT-A TOPSIDE (OFFSHORE INSTALLATION – HEAVY LIFT)
- TENDERING for BARMADA : 2007-2009 TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES
- TENDERING for Dragon Oil Turkmenistan : ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) OF NEW 30″DIA TRUNK LINE AND INFIELD LINES CFT/45/07/335
- TENDERING for ONGC India : PIPELINE REPLACEMENT PROJECT-2 MR/OW/MM/PRP-2/15/2007
- TENDERING for BG India : HYDRA – PK & SWP 2007/B/PM/PRJ/1027
- TENDERING for Technip & Samsung: INSTALLATION & PRE-COMMISSIONING OF MARINE PIPELINE, SPM & PLEM SYSTEMS PACKAGE 8912 ITB 3500-001 / PO-0018
- CUEL Bidding : TRANSPORTATION & INSTALLATION OF THE JASMINE “B2”, D, BANYEN A JACKETS, TOPSIDE & PIPELINES 07-DLBS-0017
- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- MURPHY Bidding : PROVISION OF OFFSHORE INSTALLATION SUPPORT SERVICE FOR YEAR 2007 SUBSTRUCTURE INSTALLATION PROGRAMME P6102
- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- PCSB : Sumandak Phase 2
- Assign as Petronas Project PMT (Project Management Team). Brief all personnel including EMEPMI PMT on the workscope, MTO, Qualification & other Project data. (Since I’m involved during biding of the awarded job). Assist Offshore team executing the installation works. Actively involved in project Safety programme.
- CPOC Bidding : PHASE 1 DEVELOPMENT OF JDA BLOCK B-17 FIELDS CPOC/C3/2006/EPCIC/2004
- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- PCSB Turkmenistan & MMHE : INSTALLATION & PRE-COMM OF SUBMARINE PIPELINE 5495-9999
- Prepare technical package, develop installation schedule, estimating resources,
- Method of statement & Contract / Post Tender technical clarifications/qualifications.
- PCSB Bidding : 2007-2008 PROGRAM (KUMANG) CH2/C2/2006/DCE/378
- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- MISC / Voluntary Works
- Developing Training Module for Field Engineers.
Prepare Presentation material & Company representative in OGA 07 Exhibition.
Assisting Head of Department managing engineers workstation, Computer upgrade & purchasing, Developing presentation material for Higher Management & Supplying new field engineer with required minimum software, calculation sheets & reference for first time offshore experience.
- Developing Training Module for Field Engineers.
- General Bidding
- Replying all CLIENTs tender Pre-Screen questionnaire & SOI (Solicitation of Interest).
- PCSB : Bidding Tender CH2/C3/2003/DCE/032 (Extension 2007)
Tender Title – TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR MAJOR PROJECTS PORTFOLIO- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- BSP : Bidding Tender C060103/MPM
Tender Title – TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR MAJOR PROJECTS PORTFOLIO- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- TALISMAN : Bidding Tender B00914
Tender Title – Transportation and Installation of Pipelines for PM3 CAA Northern Fields Development Project- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- PCSB : Bidding Tender CH2/C5/2006/DCE/090
Tender Title – Transportation and Installation of Offshore Facilities- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- EMEPMI : Bidding Tender DU3628
Tender Title – 2007-2008 Transportation and Installation of Offshore Facilities for EMEPMI- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- PETRONAS TURKMENISTAN (MDP-A) 5495-0399
- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract / Post Tender technical clarifications/qualifications.
- RELIANCE : Bidding Tender MR/OW/MM/MHBS4WPP-1/16/2005
Tender Title – INSTALLATION OF OFFSHORE FACILITIES FOR DEVELOPMENT OF KGD6 BLOCK- Prepare technical package, develop installation schedule, estimating resources, Method of statement & Contract technical clarifications/qualifications.
- NEWFIELD : Bidding Tender C-NFX-PM323-P-6016 (2007)
Tender Title – Provision of Transportation and Offshore installation of East Belumut-A and Chermingat Pipelines, Jacket and Topside. (3 Pipelines, 4-legged jacket & Tripod)- Identify detail scope of work, develop installation schedule, estimate resources for the job, prepare engineering document i.e. method of statement & contract technical clarifications/qualifications.
- SSB : Bidding Tender TN 591447 (2007 – 2009)
Tender Title – 2007-2009 Transportation and Installation of Offshore Facilities .- Identify detail scope of work (pipelines scope), develop installation schedule, estimate resources for the job, prepare engineering document i.e. method of statement & contract technical clarifications/qualifications.
- PCSB : Baram Pipeline Replacement Project
- Onboard DB30
- Field assignment to lay 16†dia. BAPA-AA MCOT, 10†BAP-AA/BAP-B & 10†BAP-AA to BADP-G.
- All pipelines are started up using bow-string.
Prepare pipelay procedures for 16†dia. x 26.5 km BAP-AA to MCOT, 10†dia. x 10.87 BAP-AA to BAP-B & 10†dia. x 1.78km BAP-AA to BADP-G.
- EMEPMI : Installation of GuE 8-Legged & Tripod Platforms
- Onboard Kuroshio 1
- Field assignment to install GuE 8-Legged Jacket (Launching) & the MSF. And to install GuE Tripod & BSF
- SSB : Installation of E8DR-A Platform
- Complete the as-built documentation.
- Onboard Kuroshio 1
- Field assignment to install the 4 legged jacket, conductors and topside.
Ramunia Fabricators S/B, Teluk Ramunia - Jacket & Topside Loadout coordination.
- SSB : Installation of SCK-A Module 2 & 2A and E11P-A 16â€AP& 6â€LP Vent extension
- Complete the as-built documentation for installation of Module 2& 2A and its appurtenances and the E11P-A vent extensions
- Onboard Kuroshio 1
- Field assignment to install both E11K-A Module 2 & 2A, Metering Skid, SC Cooler and E11P-A Atmosperic/Low Pressure Vent extensions.
- MMHE Pasir Gudang
- Boogey loadout of M2 & M2A and its appurtenances.
Prepare installation procedure, rigging calculation & loadout coordination manual for installation of Module 2 & 2A at E11K-A.
- SSB : Structural Program year 2005
- Complete the as-built documentation for F13(SW)DR-A platform installation.
- Coordinate with site loadout coordinator for loadout of F13 Jacket and topside.
- Coordination meeting with fabricator for loadout of SSB year 2005 structures i.e F13 jackets & topside, E11P-B jackets & topside, E8DR-A jackets & topside, E11K-A(SCK-A) Modules 2 & 2A and E11V-B Jacket (2006).
- Preparation of anchor handling procedure for Castoro 8.
- EMEPMI : Guntong F – GuF Platform (Recovery & Installation Works)
- Prepare as-built documents for Guntong-F platform installation complete with as-built marked up drawings.
- Platform Remote Works
- Remote work for GuF platform. Repair damage during construction, final tie-in, welding & painting
- Onboard Kuroshio 1.
- Extract piles from jacket legs. GuF jacket recovery. Tiedown and transport jacket back to RFSB yard for inspection
- Onboard DPDSV Miss Marie
- Mobilization of DPDSV Miss Marie at Loyang, Singapore.
- Underwater inspection (MPI) of collapsed Guf jacket
- Ramunia Fabricators & SSE, Teluk Ramunia, Johore, Malaysia.
- Loadout of GuF & IbC jacket & appurtenances at SSE Teluk Ramunia.
- Loadout of GuF & IbC topside & appurtenances at Ramunia Fabricators.
- Coordinating vessel movements for all loadout. Monitoring lifting of all jackets & topsides(Asian Herculeus) Monitoring tie-down and lifting activities.
- EMEPMI : DPDSV Programme for EMEPMI Year 2004
- Onboard DPDSV Miss Marie
- Mobilization of DPDSV Miss Marie at Loyang, Singapore.
- 16†RaA/SeA Riser Clamps Installation at RaA platform
- Derig installation aids at 6†& 12†risers at IbA platform
- Installation of magnetic markers onto 16†Crude SeA/SeD pipeline
- EMEPMI : Irong Barat C – IbC Platform
- Prepare as-built documents for Guntong-F & Ib-C platforms installation complete with as-built marked up drawings.
- Platform Remote Works
- Remote work for GuF platform. Repair damage during construction, final tie-in, welding & blasting/painting
- Onboard Kuroshio 1.
- Installation of tripod Jacket. Piles and Conductor Installation. Topside installation.
- Ramunia Fabricators & SSE, Teluk Ramunia, Johore, Malaysia.
- Loadout of GuF & IbC jacket & appurtenance at SSE Teluk Ramunia.
- Loadout of GuF & IbC topside & appurtenances at Ramunia Fabricatiors.
- Coordinating vessel movements for all loadout. Monitoring lifting of all jackets & topsides(Asian Herculeus) Monitoring tie-down and lifting activities.
- EMEPMI : 16†Dia. x 32km RaA/SeA Pipeline
- Preparation of pipeline installation procedures.
- PCSB : Duyong CPP Module
- Preparation of loadout coordination manual and installation procedures for Duyong CPP Gas Compression Module.
- PCSB : MLNG-Tiga – 32†Dia. X 120km SC3 to E11R-C TR No. 6.
- Onshore Slugcatcher No.3 (SC3) MLNG-Tiga Plant
- Continue vacuum drying, Reswabbing and reinstatement works at SC3 worksite.
- Onboard MV Setia Abadi
- Pre-commissioning. Continue with bulk and final dewatering.
- Onboard DLB 264
- Continue pipelay and riser installation at E11R-C. Preparation to demobilize DLB 264.
- Onboard DLB 264
- Startup and pipelay.
- Assisting in preparing partial lay and beach pull procedure.
- PCSB : MLNG-Tiga – 24†Dia. X 40km B11DR-A to HCP Pipeline.
- Onboard MV Sirocco 6101
- Pre-commissioning. i.e continue with vacuum drying.
- Onboard MV Osam Dragon.
- Pre-commissioning. i.e Pigging, hydrotest, bulk dewatering & final dewatering.
Onboard DLB 264 - Pipelay and risers installation at both platforms.
- PCSB : ANGSI – 24†Dia. X 82km Seligi-A to ANDR-A Pipeline repair.
- Onboard ANDR-A Platform
- Launching the pig train for leak joint isolation. Consisting of 4 nos of bi-di and 2 nos of PSI smart plug double module.
- Onboard DP Petani Shamal
- Pig train tracking using isotop (Gammatrac)
- Onboard HDB 289
- Leak joint isolation works. Permanent repair of the pipeline by removing the leaked joint (c/w PLIDCO Clamp) & Installation of replacement spool. Pressure
- Test using KAMOS leak test.
- Subcontractor technical evaluation.
- Witness the smart plug FAT (Factory Acceptance Test) at PSI main office Stavanger Norway.
- Project Construction Risk Analysis conducted by Esso.
- SSB : 6†Dia. X 3.5km EWP-A to EWDP-B Pipeline (1st Phase)
- Onboard EWP-A & EWDP-B Platforms
- Performing pigging, cleaning and gauging operation
through the pipeline from temporary pig launcher installed at EWP-A platform to temporary receiver at EWDP-B Platform. - Run pigs Polybrush (1 unit), Bi-di c/w brush (1 unit), Bi-di standard & Bi-di c/w gauging plate (95% of p/l diameter).
- Running the EGP (Electronic Geometry Pig) and DCP (Corrosion Detection Pig) intelligent pig to determine the pipeline condition before hydrotest.
- PCSB : MLNG-Tiga – 30†Dia. x 155km Pipeline M1DR-A to E11R-C
- Onboard Teknik Putra
- Post lay survey Side Scan Sonar operated on a 50m range from pipeline (both side of the pipeline) Cross line survey using survey echo sounder to confirm the pipeline exact position.
- PCSB : MLNG-Tiga – E11R-C Platform
- MSE, Pasir Gudang Johore, Malaysia.
- Loadout of (E11R-C West Side) Riser Guard/Emergency Boatlanding.
- Coordinating vessel movements for boatlanding & its shiploose transportation.
- Monitoring Boatlanding loadout to material barge (Dynaroy III + Destiny III).
- Monitoring tie-down and lifting activities.
- MSE, Pasir Gudang Johore, Malaysia.
- Loadout of (E11R-C East Side) Boatlanding Loadout.
- Coordinating vessel movements for boatlanding & its shiploose transportation.
Monitoring Boatlanding loadout to material barge (Container Aquarius + Mayang Sari). - Monitoring tie-down and lifting activities.
- PCSB : MLNG-Tiga – 32†Dia. x 118km SC3 to E11R-C TR No. 5.
- Onboard MV Vision III
- Bulk & Final Dewatering.
- Spading, Jumper Installation & preparation work for vacuum drying of 28†dia. & 32†dia. SC3/E11R-C/E11R-B pipelines.
- Assisting in preparing pipelay and beach pull procedure.
- PCSB : MLNG-Tiga – 28†Dia. X 3.5km E11R-C to E11R-B
- Onboard MV Laser III
- Bulk & Final Dewatering.
- Spading, Jumper Installation & preparation work for vacuum drying of 28†dia. & 32†dia. SC3/E11R-C/E11R-B pipelines.
- PCSB : MASA – Anode Retrofit
- Onboard DPDSV Eagle
- Installation of anode sleds at 12â€, 14†and 16†MASA Pipeline.
- Monitoring fabrication of 21 anode sleds at CMB.
- Vessel Inspection & Construction Risk Analysis (CRA), Conducted by DNV
- SSB : South Furious – 14†Dia. X 10km M3DR-A to M4 Manifold Pipeline
- Onboard MV Sea Panther
- Pipeline Pre-commisioning
- SSB : South Furious – 2nd Phase (Various Jobs)
- Onboard DSV Ocean Winsertor
- Riser & J-tube clamps installation at F23DP-A and M3DR-A. Spool tie-in (riser to pipeline and pipeline to subsea wellhead) at F23DP-A, M3DR-A, F23SW and M4.
- SCM (Subsea Control Module) and UTHLB (Umbilical Termination Head Landing Base) Installation at F223SW wellhead.
- Pre-Commisioning support for F23DR-A to F23SW 12″ pipeline.
- PCSB : ANGSI – ANPG-A Platform
- Onboard MV Seabulk Freedom
- Remote work consisting of Welding (Module haunchbeam, Bridge sliding shoes and donkey dick & Stairs), installation of misc. items (Intermodule beams, handrails, garbage chute & caissons) and touch-up paints at weldment areas.
- Onboard DB 30
- Topside installation. i.e. Heavy lifting of 2 nos of MSFs (MSF North & MSF South), 5 nos of topside modules (M2, M3, M4, M5 & M6 living quarters), Helideck & 100m bridge connecting ANPG-A and ANDR-A
- Onboard DB30
- Complete installation of 8 legged jacket.
- Piling 32 nos piles and installation of 8 nos transition pieces.
- SSE, Teluk Ramunia Johore.
- Loadout Coordinator. Coordinating vessel movements for jacket and piles transportation.
- Monitoring jacket and piles loadout to material barge.
- Monitoring tie-down and lifting activities.
- PCSB : ANGSI – ANDP-B Platform
- Onboard MV Seabulk Freedom
- Installation of misc items and touch up works at weldment area.
- Onboard DB30
- Installation of ANDP-B comprehensive module.
BDEWC Kuching
- Loadout Coordinator. Coordinating vessel movements for topside and
conductors transportation. Monitoring topside loadout (using bogey) and
conductors loadout. Monitoring tie-down and lifting activities.
- SSE, Teluk Ramunia Johor
- Loadout Coordinator. Coordinating vessel movements for jacket and piles transportation.
- Monitoring jacket and piles loadout to material barge. Monitoring tie-down and lifting activities.
- PCSB : ANGSI – 32†Dia. X 56km ANDR-A to Guntong-D Pipeline
- Onboard MV Vision III
- Tiger stripe of 6 risers at ANDR-A platform and 1 riser of Gu-D Platform
- PCSB : 32†pipeline 56 KM Andr-A to Guntong-D Platform.
- Onboard MV Seabulk Freedom
- Preocommissioning works
- Preparing QA Procedure for RESAK Development Programme I& ANGSI 2000/2001 Offshore Installation Programme
- Preparing QA Procedure for tender bidding (MLNG3 Pipeline & Offshore Installation)